A job runs late, someone asks for a rush order and two operations want the same machine. The planning sits in a spreadsheet only one colleague understands, and orders arrive by email and get retyped. We build the software that takes over the retyping and lets the planning do the sums with the shop floor. If there is nothing to gain, no proposal follows. It runs alongside the system that is already there; we ask for two years of history, we take care of the rest, and messy data shows up in the first step.

Pipework of an industrial plant, seen straight from above
  • 67.7%Of order emails at a wholesaler become a correct draft order
  • 5,017Order emails in that measurement
  • 45%Less unplanned downtime at a manufacturer with 340 machines
1Where it gets stuck

Three places where the sector gets stuck

  • 01

    Planning that does not know the shop floor

    Planning that ignores machines, people and changeover times costs capacity. Planning that does take them into account gets more out of the line and shortens changeovers.

  • 02

    Unplanned downtime

    Every hour the line stands still costs money and pushes the planning back. Maintenance on a forecast sees a breakdown coming weeks ahead.

  • 03

    Inspection by eye

    With inspection by eye, defects slip through. A camera that has learned what a good product looks like watches while the line runs and also sees the deviations the eye misses.

Welder at work in a metal workshop
2What we build

Built on the company's own data and connected to what already runs

  1. 01

    Planning and simulating production

    A calculation model of the line, used to test the planning before anything changes on the floor.

    • See where the line gets stuck
    • Shorter changeover times
    • Less scrap
    • Lower energy use
  2. 02

    Maintenance before it goes wrong

    Seeing breakdowns coming before they happen: from the sensor data on the machine to a maintenance alert the engineer can act on.

    • Vibrations measured and tracked
    • Alert on unusual behaviour
    • How long a part will last
    • Maintenance scheduled on the forecast
  3. 03

    Quality control with cameras

    Cameras on the line that inspect every product: faster and more accurate than checking by eye. Whatever deviates goes to a person.

    • Defects recognised
    • Surfaces inspected
    • Dimensions checked
    • Instant alert on rejects

The Data Impact Scan

Curious what this looks like on your data?

Book an intro call with the solution architect who also builds the work. You walk through your processes together and get an honest answer on where the numbers are for you, and where they are not.

Book an intro call

30 minutes, no obligation, directly with the builder.

Thirty minutes to see where the biggest impact is.

An honest estimate in numbers, even if the answer is that it does not pay off.