Trips, loads and stock

Logistics and supply chain

Orders arrive by email and PDF and get retyped into the TMS, trips are pieced together by hand and the stock sits in an Excel list. We build the software that takes over the retyping and lets the planning do the sums, and the team decides. If there is nothing to gain, no proposal follows. It runs alongside the system that is already there; we ask for two years of history, we take care of the rest, and messy data shows up in the first step.

Lorry on a flyover crossing a motorway, seen straight from above
  • 67.7%Of order emails at a wholesaler become a correct draft order
  • 5,017Order emails in that measurement
  • 86%Forecast accuracy at a market leader, up from 40%
1Where it gets stuck

Three places where the sector gets stuck

  • 01

    Demand nobody sees coming

    When demand comes as a surprise, there is too much in stock or orders cannot be filled. A forecast per item looks up to 12 months ahead.

  • 02

    Trips pieced together by hand

    Trip planning on experience costs miles, time and fuel. Planning that works with addresses, time windows and load space shows where those miles can be taken out.

  • 03

    Retyping at the order desk and in the warehouse

    Retyping orders from email and PDF, retyping lists and hunting for locations holds the work up. That typing can go, and whatever deviates goes to a colleague.

Tanker trailers parked side by side, seen straight from above
2What we build

Built on the company's own data and connected to what already runs

  1. 01

    Demand forecast per item

    A forecast that takes season, promotions and what happens outside into account, tested on the company's own sales data.

    • Seasonal patterns per item
    • Effect of promotions included
    • Weather and events weighed in
    • Forecast per SKU
  2. 02

    Orders and waybills from email and PDF

    Orders, CMRs and proofs of delivery that arrive as email, PDF or photo are ready in the TMS. The order desk checks and confirms.

    • Order from email and PDF made ready
    • Waybill and proof of delivery read in
    • What is missing is listed at the top
    • Connection with the TMS
  3. 03

    Stock that adds up

    Stock levels that move with the forecast and with the agreed delivery reliability. The planner decides.

    • Safety stock calculated
    • Reorder point per item
    • Items sorted by revenue and predictability
    • Stock across several warehouses
3Case
Warehouse with racks full of boxes and order pickers at work

International manufacturer

Forecast more than twice as accurate for new products

Not logistics, but the same question: what should be in stock tomorrow? A global market leader in construction tools wanted to forecast demand for new products better. With a forecast per product, accuracy rose from 40% to 86%.

86%Accuracy, up from 40%
Read the case

The Data Impact Scan

Curious what this looks like on your data?

Book an intro call with the solution architect who also builds the work. You walk through your processes together and get an honest answer on where the numbers are for you, and where they are not.

Book an intro call

30 minutes, no obligation, directly with the builder.

Thirty minutes to see where the biggest impact is.

An honest estimate in numbers, even if the answer is that it does not pay off.