SLIM subsidy: 60% of team training costs

The team has to learn to work with new systems and AI tools, such as order emails that arrive as draft orders, planning that no longer lives in one head, and links with the ERP, while nobody has time for a training. SLIM reimburses 60% of the training costs, between €5,000 and €24,999 per application. No period is open right now and the next one has not been announced; the subsidy alert and an intro call make sure the application is ready when it comes.Updated: November 2026

Cost reimbursement
60%
Maximum subsidy
€24.999
When oversubscribed (both 2026 periods)
Lottery
Next period
Not yet known
  • Wholesaler: 3,300 of 5,017 order emails no longer retyped (September 2026)
  • Masparts forecasts quotes with 84% accuracy
  • Intro call of 30 minutes, no obligation
1Quick answer
  1. The team has to learn new systems and AI tools (order emails, planning, ERP links), and nobody has time for a training. SLIM reimburses 60% of the training costs.

  2. Subsidy of €5,000 to €24,999 per application, for SMEs up to 250 employees.

  3. Period 1 (7 April to 4 May 2026) and period 2 (19 August to 7 September 2026) were oversubscribed and decided by lottery. No period is open now; the next one is not yet known (source: Uitvoering van Beleid).

  4. Eligible: training for current or future roles, such as working with new systems, data skills and AI tools. SLIM pays for training, not for software or build work.

  5. A 30-minute intro call checks whether SLIM fits. If not, we say so and no proposal follows.

2Status & timing

When can you apply?

For most schemes the opening date is what counts, the budget is often gone on day one. Here's the live status.

SLIM (individueel mkb)

Closed, next round
Next opening
Not yet announced
Allocation
lottery on opening day
Start prep
~5 weeks ahead
Rate
60% (micro tot 80%)
Max
€24.999
Budget
€71,9 miljoen (totaal SLIM 2026)

The budget is usually gone on opening day. Order is decided by lottery, so submitting earlier doesn't help, make sure your complete application is ready on day one.

SLIM (samenwerkingsverband)

Closed, next round
Next opening
Not yet announced
Allocation
lottery on opening day
Start prep
~7 weeks ahead
Rate
60%
Max
€500.000 (max €200.000 per deelnemer)

The budget is usually gone on opening day. Order is decided by lottery, so submitting earlier doesn't help, make sure your complete application is ready on day one.

Don't miss the opening day

Leave your region and email. We'll reach out personally, well before SLIM (individueel mkb) opens, to check whether you qualify and prepare your application so it's ready on day one.

For: SLIM (individueel mkb)

We don't blast newsletters, we contact you personally, well before the opening date, to prepare your application.

We design the project and help write the application

Stratalytic is a team of solution architects, data scientists and engineers. We design and build the project and help write the application, so it describes work that actually happens. The first step is an intro call of 30 minutes, no obligation.

3The scheme7 topics
01

What is the SLIM subsidy?

SLIM (Stimuleringsregeling Leren en ontwikkelen in het MKB) reimburses 60% of the eligible costs of training employees. Per individual application the subsidy amount lies between €5,000 and €24,999. Uitvoering van Beleid, part of the Ministry of Social Affairs and Employment, runs the scheme, and according to the ministry the 2026 budget is €71.9 million.

Costs that count include external courses and workshops, wage costs of participants during training (at a fixed hourly rate) and the cost of a training plan. VAT does not count.

02

When can SLIM be applied for?

Not right now. Period 1 ran from 7 April to 4 May 2026 and was oversubscribed (budget €11 million). Period 2 ran from 19 August (first announced as 10 August) to 7 September 2026 and was heavily oversubscribed, so applications were drawn by lottery. Collaborations had their own period from 22 June to 20 July 2026, also decided by lottery.

The next period has not been announced; Uitvoering van Beleid gives no date. The scheme runs through 2029, so new periods will come. When is not known, and we will not guess.

The subsidy alert on this page sends a message the day a period opens. The intro call is the moment to check whether SLIM fits at all, so the application can be ready beforehand.

03

What the team learns: working with new systems and AI tools

The reason to look at SLIM is usually a work problem. Order emails arrive in the inbox and someone retypes them. The production list lands by email and gets pasted into a separate Excel file. A new link to the ERP is coming, or an AI tool that prepares draft orders, and nobody has time for a training.

That is the work SLIM pays to learn: handling the new ordering flow, checking what the tool proposes, knowing what goes through and what goes to a colleague. At a wholesaler, nobody has to retype two out of three order emails any more (3,300 of 5,017 order emails, measured in September 2026): before, everything was by hand, now 67.7% arrives as a correct draft order. The team still checks, and exceptions go to a person.

The same training can include AI literacy: knowing what AI can and cannot do and checking its output. What the EU AI Act asks of a company this size is explained on the EU AI Act page.

04

Who qualifies for SLIM?

SMEs that meet the European definition: at most 250 employees and either annual turnover up to €50 million or a balance sheet total up to €43 million. There is no sector restriction, so manufacturing, wholesale and logistics qualify.

The training must be aimed at the employee's current or future role. Degree programs (vocational, bachelor, master) are generally excluded; short courses and professional certifications can qualify. Internal training can count if the costs are documented.

05

How much subsidy is it?

SLIM reimburses 60% of eligible costs. The subsidy amount per application lies between €5,000 and €24,999.

Worked example (fictional project): with €24,000 in eligible costs, the subsidy is €14,400. The remaining €9,600 is paid by the company. VAT is not eligible, and neither are costs incurred before the application date.

06

How does the application work?

The application is submitted digitally to Uitvoering van Beleid while a period is open. It needs an activity plan (what, for whom, why), a budget with cost substantiation, an SME declaration and, if applicable, quotes from external trainers.

When a period is oversubscribed, a lottery decides which applications are assessed. Not being drawn says nothing about the quality of the application; the next period is the next chance. Activities start only after the application is submitted.

07

When SLIM does not fit

SLIM pays for training, not for software or build work. A wholesaler that only has existing software configured, and needs no training for it, gains little. The same goes for the WBSO, which covers technically new development work (R&D), not configuring standard software. A link between systems that does not yet exist technically can qualify for the WBSO; configuring a standard ERP cannot.

Does it not fit? Then we say so in the intro call and no proposal follows. The time it takes is 30 minutes, plus a few hours of input for the application. No new system is needed: the training runs on what is already there, such as the ERP, Excel and email.

4Process

How does it work?

  1. Intro call of 30 minutes

    We discuss which work the team has to learn, whether SLIM fits and what a next period could mean. If it does not fit, we say so and no proposal follows.

  2. Application ready

    We put together the activity plan, budget and SME declaration, so the application can go in the day a period opens.

  3. Training on the team's own work

    After approval we train the team on the real flow: order emails, planning and the links with the ERP, including checking what an AI tool proposes.

5FAQ

Frequently asked questions

What is the SLIM subsidy?

SLIM stands for Stimuleringsregeling Leren en ontwikkelen in het MKB (Incentive Scheme for Learning and Development in SMEs). It reimburses 60% of eligible training costs for employees. For an individual application the subsidy amount is between €5,000 and €24,999. Uitvoering van Beleid, part of the Dutch Ministry of Social Affairs and Employment, runs the scheme. It covers 2025 through 2029.

Is SLIM open for applications right now?

No. Period 1 ran from April 7 to May 4, 2026 and was oversubscribed. Period 2 ran from August 19 (first announced as August 10) to September 7, 2026 and was heavily oversubscribed, so applications were drawn by lottery. A next period has not been announced (source: Uitvoering van Beleid). The scheme runs through 2029, so new periods will come, but when is not known.

Who is eligible for SLIM?

SMEs: organizations with at most 250 employees and annual turnover up to €50 million or a balance sheet total up to €43 million, established in the Netherlands. Private companies, sole proprietorships and foundations qualify. There is no sector restriction, so manufacturing, wholesale and logistics are included.

How much subsidy can I receive through SLIM?

The scheme reimburses 60% of eligible costs. Per application the subsidy amount is between €5,000 and €24,999. Eligible costs include external training, participant wage costs during training (at a fixed hourly rate) and the cost of a training plan. VAT is not eligible.

Which training qualifies?

Training that helps employees do better in their current or a future role. At a manufacturer or wholesaler that means, for example, learning to work with a new ERP or a new link between systems, planning that no longer lives in one person's head, data skills and working with AI tools. Degree programs (vocational, bachelor, master) generally do not qualify. Internal training can count if the costs are substantiated.

What does the EU AI Act have to do with SLIM?

The EU AI Act expects companies that use AI to take measures that support their staff's AI literacy: knowing what AI can and cannot do, and checking the result. A training course can be such a measure and fits within SLIM. The law does not tie itself to SLIM; the subsidy reimburses the training whatever the reason for it. What the law asks is explained on the EU AI Act page.

Can I combine SLIM with the WBSO?

Yes, but they pay for different things. SLIM reimburses training of the team. The WBSO covers technically new development work (R&D) and not the configuration of existing software. A link between systems that does not exist technically yet can qualify for the WBSO; configuring a standard ERP does not. If the work does not fit the WBSO, SLIM is still possible for the training.

How long does it take from application to decision?

That differs per period and is published by Uitvoering van Beleid. When a period is oversubscribed it ends with a lottery, followed by the assessment of the drawn applications. Only start the activities after submitting the application: costs incurred before the application date are not eligible. After approval there is a fixed period to carry out the activities.

Which documents are needed for the application?

An activity plan (what happens, for whom and why), a budget with cost substantiation, an SME declaration and quotes from external trainers if there are any. We put these together so the application is ready the moment a period opens.

What if my application is not granted?

In an oversubscribed period a lottery decides, so not being drawn says nothing about the quality of the application. The next period is the next chance; when that comes is not yet known. That is why it pays to have the application ready beforehand.

How much of our time does it take, and do we need a new system?

An intro call of 30 minutes, no obligation. After that the application needs a few hours of input: which team, which work, which training. We handle the rest. No new system is needed: the training runs on the systems already in place, such as the ERP, Excel and email.

Does SLIM always fit?

No. SLIM pays for training, not for software or build work. A company that mainly wants a system configured and needs no training gains little from SLIM. If it does not fit, we say so in the intro call and no proposal follows.

Thirty minutes to see where the biggest impact is.

An honest estimate in numbers, even if the answer is that it does not pay off.