Software development subsidy: when custom software qualifies and when not

Orders retyped every morning, systems that do not talk to each other, planning that sits in one colleague's head: sometimes the fix is software that does not exist yet, and for that build a subsidy sometimes exists. Not for every software project: the WBSO fits technically new development work, and MIT for R&D collaboration needs two SME partners and is closed at the moment. What gets built runs alongside the existing ERP, and after delivery the code belongs to the client.Updated: November 2026

WBSO standard rate
36%
WBSO for starters
50%
MIT subsidy rate
35%
MIT feasibility, maximum
€20.000
  • At a wholesaler nobody has to retype two of the three order emails anymore (3,300 of 5,017 order emails, measured in September 2026)
  • Masparts predicts quotes with 84% accuracy
1Quick answer
  1. Retyping orders, systems that do not talk to each other, planning that sits in someone's head: sometimes the fix is software that does not exist yet. A subsidy exists only for that development work, not for every software project.

  2. The WBSO gives a 36% reduction on payroll tax over the wage costs of technically new development work (starters 50%, up to €391,020 per year). Applications for 2027 can be filed from mid-November 2026.

  3. Fits: an integration between warehouse system and ERP or carrier that does not technically exist yet; a calculation model that is not in standard software. Does not fit: setting up a standard package, or a website.

  4. MIT: R&D collaboration requires two SME partners and is closed now (2026 window: 9 June to 15 September, no new date known, source RVO). MIT feasibility runs regionally per province; the next round is not yet known.

  5. What gets built runs alongside the existing ERP and after delivery the code belongs to the client. First step: an intro call of 30 minutes; if it does not fit, no proposal follows.

2Status & timing

When can you apply?

For most schemes the opening date is what counts, the budget is often gone on day one. Here's the live status.

WBSO

Year-round
Apply
Year-round
Allocation
monthly applications
Start prep
~2 weeks ahead
Rate
36% / 50%*
Budget
€1,817 miljard

You can apply every month (by the last day of the month for the next month). Apply before your R&D work starts, retroactive claims aren't possible.

Check whether you qualify

Leave your region and email. We'll reach out personally to check whether you qualify for WBSO and to prepare the application with you.

For: WBSO

We don't blast newsletters, we contact you personally, well before the opening date, to prepare your application.

We design the project and help write the application

Stratalytic is a team of solution architects, data scientists and engineers. We design and build the project and help write the application, so it describes work that actually happens. The first step is an intro call of 30 minutes, no obligation.

3The scheme6 topics
01

Which software is eligible for subsidies?

Custom software qualifies when the development work is technically new for the company and it is genuinely uncertain at the start whether the approach works. Think of an integration between warehouse system, ERP and carrier that does not exist yet, or a calculation model for planning or purchasing that is in no standard package.

What does not qualify: buying off-the-shelf software, setting up or configuring Exact, AFAS, SAP Business One, Dynamics or Odoo, switching on a standard connector, or building a standard website. A wholesaler that only sets up existing software does no research and development work. We say so, and no proposal follows.

RVO assesses three things: (1) the project involves a "new information technology principle", an approach that is new for the organisation, not necessarily for the market; (2) there is real technical uncertainty whether it works, so routine development does not count; and (3) the work consists of systematic development activities. A common mistake is describing the business problem instead of the technical one.

02

WBSO or MIT, which scheme fits?

The WBSO is a reduction on payroll tax over the wage costs of development work: 36% (starters 50%) on the first €391,020 per year. Applications for 2027 can be filed from mid-November 2026. It is the scheme that fits an integration or calculation model.

The MIT scheme is not open for every software project. R&D collaboration requires at least two SME partners and is closed at the moment: the 2026 window ran from 9 June to 15 September and RVO has announced no new date. Feasibility studies run regionally per province, and the budget is often gone at opening; the next round is not yet known.

03

What does it cost in time and money?

The price depends on what is built and is fixed only after the first step. A subsidy lowers the cost of the development work, but it is never the reason to build: the work problem has to be worth solving first.

The first step is an intro call of 30 minutes. If nothing can be gained there, no proposal follows. A new system is not needed either: what gets built runs alongside the ERP that is there now.

04

Why Stratalytic?

The team builds the software and writes the technical description for the subsidy application. One party, so the description matches what is actually built. After delivery the code belongs to the client.

The work is data, calculation models and integrations around an older ERP, not generic websites or WordPress templates.

05

What the software does for the work

Order emails arrive in the ERP as a draft order that an employee checks; exceptions go to a person. Stock from the warehouse system and the ERP in one overview. A calculation model for planning or purchasing, tested on the company's own history before anything goes live.

The choice of technology does not affect the subsidy: RVO assesses how new the work is, not the tools it is built with. The team picks what fits and records it at delivery, so the client does not have to choose a framework.

06

Examples of what we built

Order processing at a wholesaler. Nobody has to retype two of the three order emails anymore (3,300 of 5,017 order emails, measured in September 2026): before, everything was done by hand, now 67.7% arrives as a correct draft order.

Quotes at Masparts. Masparts predicts quotes with 84% accuracy.

Stock platform for five warehouses. A logistics company had a stock platform built for five warehouses: the stock of all locations in one overview, a calculation of the desired stock level and purchase orders that are prepared automatically. Whether work like this counts for the WBSO depends on the technology underneath, not on the result. We decide that per project, before there is an application.

4Process

How does it work?

  1. Intro call of 30 minutes

    We look at the work problem and decide whether the software is technically new and which scheme, if any, fits. If nothing fits, no proposal follows.

  2. Application before the build

    The team writes the technical description and files the WBSO application, before the development work begins.

  3. Build and delivery

    We build the software in small steps with demos where the team can steer. After delivery the code belongs to the client.

5FAQ

Frequently asked questions

Can I get a subsidy for having software built?

Only if the development work is technically new for the company. An integration between warehouse system and ERP or carrier that does not technically exist yet, or a calculation model for planning or purchasing that is in no standard package, can qualify for the WBSO. Setting up or configuring a standard package cannot.

Does the chosen technology matter for the subsidy?

No. RVO assesses whether the development work is technically new and whether it is genuinely uncertain that the approach works, not which technology it is built with. The team picks the technology that fits the work and records it at delivery.

Do I need to build the software myself to get a subsidy?

No, the development work can be outsourced. The application is in the name of the company itself and the company keeps control of the project. How outsourced work counts exactly depends on the agreements; we settle those beforehand. The team builds and writes the technical description.

When does the subsidy have to be applied for?

For the WBSO before the development work, never afterwards: by the last day of the month before the month in which the work starts. Applications for 2027 can be filed from mid-November 2026; for a start on 1 January, by 20 December. So the application comes before the build.

Does modifying existing software count?

Only if it is technically significant further development, such as a new integration or a new calculation model alongside the existing ERP. A new field, a small change, a bug fix or a setting in Exact, AFAS or SAP Business One is not research and development work.

Is building a website eligible for subsidy?

A business website is not. Software with custom logic can be, for instance a customer portal that shows orders and stock straight from the ERP, but only if the integration underneath is technically new.

Can I use the MIT scheme for software?

For a wholesaler or manufacturer that is often not possible. MIT for R&D collaboration requires at least two SME partners; the 2026 window ran from 9 June to 15 September and the scheme is now temporarily closed, with no new date from RVO. MIT feasibility runs regionally per province and the budget is often gone at opening; the next round is not yet known.

Thirty minutes to see where the biggest impact is.

An honest estimate in numbers, even if the answer is that it does not pay off.