CRM system subsidy: what the WBSO does and does not cover

In the sales conversation it is not visible what stock is really there or what was agreed with the customer, because sales, ERP and warehouse each have their own system or Excel file. A CRM subsidy does not exist: setting up a standard CRM is not R&D and gets no subsidy. The WBSO can apply to the technically new part, such as a link that does not exist yet.Updated: November 2026

WBSO 2026, first tranche
36%
For starters
50%
Limit of the first tranche
€391.020
  • Wholesaler: 3,300 of 5,017 order emails no longer retyped (September 2026)
  • Runs next to the ERP
  • Nothing to gain: no proposal
1Quick answer
  1. In the sales conversation it is not visible what stock is really there or what was agreed with the customer, because sales, ERP and warehouse each have their own system or Excel file.

  2. A CRM subsidy as such does not exist. Setting up a standard CRM is not R&D (S&O) and gets no subsidy.

  3. The WBSO can apply to the technically new part, such as a link between CRM, ERP and warehouse that does not exist yet: 36% on the first €391,020 of R&D costs, starters 50%.

  4. Applications for 2027 open in mid-November 2026, with 20 December as the deadline for a start on 1 January. The application always comes before the work.

  5. It runs next to the ERP, no new system needed. If there is nothing to gain, no proposal follows.

2Status & timing

When can you apply?

For most schemes the opening date is what counts, the budget is often gone on day one. Here's the live status.

WBSO

Year-round
Apply
Year-round
Allocation
monthly applications
Start prep
~2 weeks ahead
Rate
36% / 50%*
Budget
€1,817 miljard

You can apply every month (by the last day of the month for the next month). Apply before your R&D work starts, retroactive claims aren't possible.

Check whether you qualify

Leave your region and email. We'll reach out personally to check whether you qualify for WBSO and to prepare the application with you.

For: WBSO

We don't blast newsletters, we contact you personally, well before the opening date, to prepare your application.

We design the project and help write the application

Stratalytic is a team of solution architects, data scientists and engineers. We design and build the project and help write the application, so it describes work that actually happens. The first step is an intro call of 30 minutes, no obligation.

3The scheme5 topics
01

Is there a subsidy for a CRM system?

Not under that name. No scheme finances a CRM system. What does exist is the WBSO, a reduction on payroll tax for technically new development work (in Dutch: speur- en ontwikkelingswerk, S&O). It looks at the work, not at the type of system.

Setting up a standard CRM is not R&D. Configuring a package such as HubSpot or Salesforce, creating fields and users, importing customer data and training the team: no subsidy. A wholesaler that only configures existing software does not do R&D, and we will say so.

02

When it can apply: a link that does not exist

A salesperson has a customer on the phone who wants two pallets of an article, delivered tomorrow. The stock is in the ERP, what the warehouse has reserved is in an Excel list, and what was agreed with this customer about price and delivery time is in emails and in the salesperson's head. The answer is “I will call you back”.

What is missing is a link: stock minus reservations, next to the customer agreements, in the screen where the conversation happens. If that link does not exist, and it is uncertain up front whether it can be made reliable with the systems that are there (an older ERP, Excel, the warehouse), that is technically new development work. The WBSO can cover the hours of the developers who work that out and build it. RVO assesses this per application; there is no guarantee.

What does not count in the same project: choosing and configuring the CRM itself, importing customer data and training.

03

What the WBSO returns and when to apply

In 2026 the WBSO gives 36% on the first €391,020 of R&D costs and 16% above that. Starters get 50% on the first tranche. For 2027 the same percentages and tranche limit were announced on Budget Day (15 September 2026), subject to approval by the Senate.

Applications for 2027 open in mid-November 2026. For a start on 1 January the deadline is 20 December. The application always comes before the R&D work, never afterwards: at the latest on the last day of the month before the month the work starts. An employer can make up to four applications per year. More in the WBSO page.

04

Other schemes, honestly

MIT feasibility (35%, up to €20,000) runs per province, not through RVO. The budget is usually gone on opening day and the next round is not yet known. MIT R&D collaboration needs at least two SME partners, which is often not available to a wholesaler; it is closed now with no new date announced by RVO.

Mijn Digitale Zaak is not open at the moment, and no new date has been announced. The problem itself does not have to wait for a subsidy: a first link can start small. See the overview for what is open now.

05

What a start looks like

At a wholesaler, nobody has to retype two of the three order emails anymore (3,300 of 5,017 order emails, measured in September 2026): before everything by hand, now 67.7% as a correct draft order. That is different work from a CRM, but the same approach: evidence on the company's own data first, start small, the team stays in control.

It takes thirty minutes for the intro call, then access to the systems the link has to connect. We handle the build, the link and going live, next to the ERP that is there. After delivery the code belongs to the company.

4Process

How does it work?

  1. Intro call of 30 minutes

    No obligation. We hear which work is still done by hand and which systems do not see each other, and say honestly whether technically new work is in it. If not, no subsidy proposal follows.

  2. Application before the start

    If there is work that qualifies, we help write the technical description. The WBSO application always comes before the work, never afterwards.

  3. Build and link

    We handle the build, the link and going live, next to the ERP that is there. The team stays in control, and after delivery the code belongs to the company.

5FAQ

Frequently asked questions

Is a CRM system eligible for subsidies?

Not as such. The WBSO looks at technically new development work, not at the type of system. Setting up a standard package does not qualify. A link or component that does not technically exist yet can. RVO assesses each application, so there is no guarantee up front.

What is the difference between a standard CRM and a custom one?

A standard CRM is an off-the-shelf package that gets configured. A custom CRM is software built for the way the company works. Only the development work on custom software, or on a link that does not exist yet, can fall under the WBSO. Licences and configuration do not. For a company of this size, a standard CRM with a targeted link next to the ERP is usually the sensible start.

Which parts of a CRM project can fall under the WBSO?

Work where it is uncertain up front whether it will technically succeed. For example a link that shows stock from the ERP and reservations from the warehouse in the sales screen, while those systems were not built for that. Not: creating fields and users, importing customer data, building reports inside the package itself, and training the team.

Can I extend my existing CRM with a subsidy?

Yes, if the extension is technically new work, such as a link to the ERP that does not exist. Changing settings and installing standard plugins is not.

Do we need to buy a new system?

No. What we build runs next to the ERP, the CRM and the Excel files that are there now. The team keeps working in the systems it knows.

How much subsidy can I get?

In 2026 the WBSO gives 36% on the first €391,020 of R&D costs and 16% above that. Starters get 50% on the first tranche. It only concerns the costs of the technically new part, not the whole CRM project. What that means for the company, we calculate after the intro call.

6Sources & official references

Verified information from authoritative sources

Thirty minutes to see where the biggest impact is.

An honest estimate in numbers, even if the answer is that it does not pay off.